Definition and Uses

A benefit-cost analysis (BCA) is a systematic process for identifying, quantifying, and comparing expected benefits and costs of an investment, action, or policy. Common uses of BCA at DOT include regulatory impact analysis and policy analysis, as well as infrastructure project evaluation.

BCA provides a useful benchmark from which to evaluate and compare potential transportation investments, policies, and decisions. It also helps add greater rigor to the project and policy evaluation process.

DOT Discretionary Grant Programs that Require a Benefit-Cost Analysis

Many DOT discretionary grant programs require a BCA for projects seeking federal funding, particularly those involving construction projects. Those programs include:

  • Rebuilding American Infrastructure with Sustainability and Equity (RAISE) Grant Program 
  • National Infrastructure Project Assistance program (Mega)
  • Nationally Significant Multimodal Freight and Highway Projects Grants Program (INFRA)
  • Rural Surface Transportation Grant Program (Rural)
  • Bridge Investment Program – FHWA
  • Promoting Resilient Operations for Transformative, Efficient, and Cost-Saving Transportation Program (PROTECT) (Resilience Improvement Grants and Community Resilience and Evacuation Route Grants only) – FHWA
  • Port Infrastructure Development Program (PIDP) Grants (Large Projects only) – MARAD
  • Consolidated Rail Infrastructure and Safety Improvements (CRISI) Program – FRA
  • Federal-State Partnership for Intercity Passenger Rail (FSP-National Grants only) – FRA

As applicable to the program and project type, USDOT recommends applicants make use of the Department’s Benefit-Cost Analysis Guidance for Discretionary Grant Programs. This document, which is updated each fiscal year, contains an overview of BCA, discussion of BCA methodologies, recommended values for key parameters, and sample calculations to aid applicants in the development of their BCA.

Benefits

Benefits measure the economic value of outcomes that are reasonably expected to result from the implementation of a project. Benefits typically accrue to the users of the transportation system because of changes to the characteristics of the trips they make and can also be experienced by the public at large. To the extent possible, all of the benefits reasonably expected to result from the implementation of the project or program should be monetized and included in a BCA. Where applicants are unable to quantify or monetize certain benefits, they should be linked to specific project outcomes, and their potential magnitudes and/or timing should be discussed in the analysis.

Common benefit types for transportation projects include, but are not limited to: 

  • Safety benefits
  • Travel time savings
  • Vehicle operating cost savings
  • Emission reduction
  • Improved comfort or journey quality
  • Health benefits
  • Reduced noise pollution
  • Emergency service response time improvement
  • Reductions in stormwater runoff and wildlife impacts
  • Reductions in operations and maintenance costs
  • Reductions in damages or outage impacts from improved resilience
  • Other quality of life benefits

Benefit-Cost Analysis versus Other Types of Economic Analysis

BCA considers the increased economic efficiency resulting from a project, and assesses the net change to overall societal welfare. This is distinct from other types of economic analysis, such as:

  • Economic Impact Analysis (e.g., job creation)
  • Financial Analysis (e.g., revenue impacts)
  • Distributional Analysis (e.g., equity impacts)

These other types of analysis can be used to answer important questions and aid in decision-making. However, they use different approaches and answer fundamentally different questions than does BCA. Importantly, these analyses do not provide estimates of additive benefits to be considered in BCA.

Tourist Average Annual Revenue for Boston Per Tourist: $_ X 69,230,000

Freedom Trail
U.S.S. Constitution Museum
Bunker Hill Monument Park
Freedom Trail length
Harbor Walk

4,000,000
500,000
330,000
4,830,000
ranges 43 Mile x 1,610,000 = 69,230,000 Tourists visit the Head of Harbor annually.

Costs

Project costs consist of the economic resources needed to develop and maintain a new or improved transportation facility over its lifecycle. Cost data used in the BCA should reflect the full cost of the project(s) necessary to achieve the benefits described in the BCA. Applicants should include all costs regardless of who bears the burden of specific cost item (including costs paid for by State, local, and private partners, as well as the Federal government).

Capital costs generally include the cost of land, labor, material and equipment rentals used in the project’s construction. In addition to direct construction costs, capital costs may include costs for project planning and design, environmental reviews, land acquisition, utility relocation, or transaction costs for securing financing.

The operating and maintenance (O&M) costs of the new or improved facility throughout the entire analysis period should be included in the BCA, and should be directly related to the proposed service plans for the project. For projects intended to replace, reconstruct, or rehabilitate existing infrastructure, however, the net change in O&M costs under the proposed project will often be negative, as newer infrastructure requires less frequent and less costly maintenance to keep it in service than would an aging, deteriorating asset.

 Benefit-Cost Analysis Resources

Last updated: Friday, January 24, 2025

Thousands of documents including the original plans present conditions and legal obligations of the Boston Public Development Agency to Pier 5 and the Charlestown Navy Yard historic district. Pier 5 Association is making extraordinary progress to reactivate this public property as an landmark waterfront national park providing healthful recreation, cultural events and…

From an ecological perspective, abutters can collaborate on flood resilience strategies and sustainable design, ensuring that Pier 5’s redevelopment aligns with Boston’s climate adaptation goals.

A park designed with living shorelines, floating wetlands, and stormwater management features would enhance the Navy Yard’s coastal resilience while preserving waterfront access for future generations.

By maintaining Pier 5 as a publicly accessible, historically sensitive, and environmentally responsible space, the community and its institutional partners can ensure that Boston’s waterfront remains a vibrant and inclusive destination, balancing modernization with heritage preservation.

Independence Day w Courageous Sails and Sounds 2024

Everything that happens on the Harbor waterfront has immediate socio-economic and ecological impacts ranging from local communities, the greater Boston area and international tourism.

For tourists seeking an authentic experience of Boston’s unique past, modern developments and multi million dollar 1% recreational vessels detract from that valuable revenue stream.

Privatization of valuable historic landmark public property, removing it from the public realm is blatantly immoral.

It benefits only the privileged for several months annually.

It does not respect the legacy of those who served our country. Some consider monopolization of Boston’s harbor access is a National Security concern.

Saving Pier 5 as a nature based Memorial Public Park with Courageous Sailing School expansion visions versus mega yachts amidst a massive population increase and diminishing canopy.

Building environmental democracy, to diversify, educate, and activate.

We participate with groups such as Engineering is Elementary, U.N. Place

Participate & Play!

About the Host: We are a team of professionals and change-makers who bring together diverse communities, companies, Universities, leaders, institutions and groups involved in renewing public access to Boston Harbor.

We are dedicated to environmental justice and the advancement of the capacity to make change!


Discover more from Harbor Park Pier 5

Subscribe to get the latest posts sent to your email.

Leave a Reply

Discover more from Harbor Park Pier 5

Subscribe now to keep reading and get access to the full archive.

Continue reading