Q-01: Who will manage this facility? Will there be any community involvement?

A special purpose entity (SPE) will be formed to govern Pier 5, and oversee Courageous Sailing’s relationships with vendors and partners. We have every intention of including community representation. Just as we have assembled a world-class working group to assemble this proposal, we will compose a comparable SPE that includes community members. 

Q-02: What is the total project cost?

As many of you know, projects at this stage have a lot of uncertainty. Working with our working group team, we estimate the total cost to support a 5-year build-out will be $65 – $80 million.

Architectural rendering of a waterfront development featuring piers, seating areas, and a pool, surrounded by buildings and water under a cloudy sky.
Figure 1 – $100 Million Design referenced in July 14, 2023 Courageous email to BPDA

Q-03: Will this project require public funding or subsidies?

In the RFP, the City of Boston committed $8 million towards the demolition of Pier 5. We will also seek applicable state and federal sources of financing.

Q-04: How will it be funded?

Our Public/Private Partnership approach combines public resources, private capital, and philanthropic support.

  1. Revenue-backed bonds, supported by both public entities and private, mission driven investors
  2. Public funding, through state and federal grants, environmental bonds, and other public sources—with strong early support from elected officials
  3. A targeted philanthropic campaign, backed by Courageous’ decades-long history of donor support and a compelling case for investment in this once-ina-generation opportunity
  4. We’ve already secured over $1M in foundational support and early individual commitments, and our Board and working group partners are aligned around scaling this vision.

Q-05: Is the Courageous proposal backed by private groups or operators to privatize the pier and enrich themselves?

Our number one priority is providing and maintaining public access to the harbor. Rumors that private equity or for-profit entities are involved are baseless. The proposal includes no funding from private equity or global entertainment companies. Our financial plan follows a public/private partnership structure, which is necessitated by the  RFP’s public benefit requirements. Our proposal delivers on the public benefit requirements in the form of publicly accessible green space, swimming, sailing, classrooms, gathering spaces, and a science initiative for harbor resiliency and education. The free public benefits are coupled with mission-aligned ticketed public activities and periodic private usage of the site facilities. Together, these produce revenue to help fund the project in lieu of 100% public financing.

Table displaying the projected gross revenue and expenses for Year 3 of the Courageous Sailing proposal, including detailed breakdowns of various revenue sources and expense categories.
Figure 2 – Pro Forma for Stabilized Year 3

Our team includes a wide range of leading local and national organizations with the necessary expertise to bring the Courageous Pier 5 proposal from the award designation stage through permitting and construction, and to provide experienced professional management for the facilities’ operations.

Most project revenue in the pro-forma goes directly to cover payroll for local employees, facility maintenance, and financing of the debt to pay for the project. Our proposal is to share any remaining operating income between Courageous – so we can provide more free programming to underserved kids – and the City.

Q-06: How will the site balance public access with private events?
A-06: We strongly believe that the waterfront is a public resource to be enjoyed by all, and the proposal is first and foremost committed to public access. We look forward to working with our neighbors and the City to develop the details of our activation plan, which would balance operational needs with a deep respect for community input and quality of life. Most of Pier 5, just like Pier 4 is today, will remain freely accessible to the public even when events or programs are taking place in portions of the space.

For reference, Courageous today hosts up to 25 open air events under its seasonal tent on Pier 4. Being a conscientious neighbor is important to Courageous. During these events, Courageous has staff assigned to monitor event noise levels and address any neighborhood concerns.

Pier 5’s year-round indoor and outdoor facility is designed to enable Courageous to operate with less noise disruption than caused by outdoor events currently taking place under the tent on Pier 4.

A detailed architectural layout diagram of a proposed facility at Pier 5, highlighting various functional areas including a learning lagoon, public spaces, a pool, and event venue, with annotations indicating specific elements.
Figure 3 – Noise impact from event venues on Piers 4 and 5

Q-07: How will you address pedestrian, drop-off, and service vehicle traffic to the site?
The Navy Yard hosts approximately 2 million visitors annually and is celebrated as a public transit-oriented and accessible destination. We have no plans to include parking and are encouraging use of multi-modal transit options that currently exist to come to the Pier.

Our preliminary traffic circulation plan gives careful consideration to pedestrian access, vehicular traffic for drop-off, and service vehicle use (deliveries, trash removal, emergency access). Pedestrians and drop-off vehicles will have multiple access points including along First Avenue and the turnarounds at the bases of Piers 4 and 5. Our service vehicle plan was designed so vehicles would not be parking or using the Pier 5 turnaround. Instead they will primarily proceed to Flagship Way Avenue or the Pier 4 turnaround, where they would be met with electric carts to bring items to Pier 5. Please see the Circulation Plan, on pages 40-43 of the proposal, for diagrams and more details.

Q-08: What is the height of the proposed building?
The two story vertical structure has been carefully designed based on local community involvement. The building’s vertical height was kept within the 35’ RFP recommendation. Further minimizing the impact on harbor views from land, the gentle slope of the building’s ascent reaches its 35’ maximum height approximately 250’ from the shoreline, and only 23% of the existing Pier 5 footprint will be taller than a single story. To minimize noise, the main gathering spaces and pool were placed on the sea side of the building. These design elements and the green roof were included to achieve the site’s public benefit while maintaining harbor views and a peaceful environment for neighboring properties.

Multiple available diagrams show the proposed structure in relation to Flagship Wharf. Please see proposal pages 69 to 72 for additional details and drawings.

A detailed architectural diagram showing the floor height analysis for the proposed Courageous building in relation to the existing Flagship Wharf, including elevation markers and measurements.
Figure 4 – Building Height Analysis

Q-09: How will this project address climate resilience and sea level rise?
As a resilient community resource engineered to stand up to rising sea levels and climate change, the plan calls for sustainable materials, green stormwater management solutions, and nature-based wave protection systems and embedded monitoring technology that would serve as both functional infrastructure and educational tools.

As a “Science Pier,” it provides marine research institutions with direct harbor access, and promotes collaboration among research institutions studying climate adaptation.

Q-10: How will this expand Courageous Sailing’s youth programming?
Our proposal would enable Courageous to eliminate our waitlist and ensure that all children and families who want to participate in our multi-week programs are able to, and would create the capacity to bring over 10,000 additional children from across the city and the region to the site for learning field trips and sailing outings.

The proposal enhances youth services through:

  • Expanded classroom spaces for marine science and sailing education.
  • Year-round programming capabilities with indoor facilities.
  • Research partnerships providing advanced STEM opportunities.
  • A harbor-fed pool enabling swimming lessons and water safety education.
  • Collaboration spaces for community youth organizations.
Nighttime view of a waterfront proposal showcasing a modern structure overhanging the water, illuminated with lights, alongside a large multi-story residential building.
Figure 5 – Design for an expanded Courageous Sailing Center on Pier 4 presented to BPDA July 5, 2022

Q-11: What specific benefits will this provide to Charlestown residents and the broader Boston community? 

The proposal offers multiple community benefits:

  • Educational opportunities through Courageous programs, aligned marine science programming, and research partnerships
  • Recreation through the harbor pool, public gathering spaces, and waterfront access
  • Job creation associated with expanded Courageous Sailing programming and the operation of the facility
  • Indoor and outdoor community meeting spaces for local organizations
  • Enhanced public engagement with the waterfront through “Science Pier” programs and activities
  • A model of resilient design, paired with smart intervention strategies, in the face of climate change

Conclusion


EXHIBIT 1 – Courageous July 14, 2023 email to BPDA with Construction Cost Estimate

From: Dave DiLorenzo dave@courageoussailing.org
Sent: Friday, July 14, 2023 3:50 PM EDT
To: Rebecca Hansen rebecca.hansen@boston.gov; William Epperson
william.j.epperson@boston.gov
CC: Dave Alexander dave.alexander@global-organics.com
Subject: Courageous / Pier 5
Attachment(s): “2023.07.10.23_Courageous_Ph I Feasibility_v 21.pdf”

Hi Rebecca and William,

Hope all’s well and your summer is off to a good start. We’re busily off and running with our
summer season and the boats are full of kids 🙂

I wanted to check in and see if the engineering study on Pier 5 is on schedule to be finished
and shareable soon, and if there’s been any change to the timeline for the upcoming RFP in the
fall. Any updates would be much appreciated.

I’m also attaching our latest Pier 5 presentation, so you have it. It’s been streamlined a bit since
we met in your offices and shared it with you. Since then were able to obtain a thorough
construction cost estimate and found that indeed, the costs of a project described by the
renderings is close to $100M — with the pier rebuild itself amounting to over 50% of the
total, and the building itself about 20%.
Given that, we’re of course open to creative
compromises and that we may land a little short of the full vision. Nonetheless we’re still very
hopeful that with the right group of partners, the value to the community and city will be worth
the expense and the effort at whatever scale is possible. And we’re doing all we can to be ready
for the RFP when the time comes.

Any updated info you have would be greatly appreciated. Thanks so much as always for your
support.

Dave
Dave DiLorenzo (He/Him/His)
Executive Director l Courageous Sailing
Office: (857) 452-1769
Direct Line: (857) 452-1776
197 8th Street Charlestown, MA 02129
website: http://www.courageoussailing.org


A detailed chart recording the program, clientele, and staffing of Courageous Sailing, showing the number of students, visitors, and adults involved in various sailing and educational activities.
An infographic illustrating the capital stack for a project proposal by Courageous Sailing, showcasing various funding sources alongside their target amounts and total contributions.

Leave a Reply

Discover more from Harbor Park Pier 5

Subscribe now to keep reading and get access to the full archive.

Continue reading